Lower Thames Valley Conservation Authority is completing a flooding study jointly with the Municipality of Chatham-Kent. This study will examine flooding in the area from the Thames River Outlet at Lake St. Clair upstream to Bloomfield Road at the south-western edge of Chatham. The study will define floodplain areas, which will allow future flood risk analysis and recommendation of actions to reduce potential health and economic loss that could occur during regional flooding.
The Process
The project will undertake floodplain mapping of the main branch of the Thames River from Bloomfield Road downstream to the mouth of the river at Lake St. Clair. The latest technology will be used to create computer models and a high-resolution map of the area that will permit communities to plan with updated floodplain information. The project will analyze historic rainfall and watercourse flow data from around the region and will produce models that will determine the probability of occurrence of flood flows to be used in the floodplain mapping and diking system analysis. A hydraulic model for the Thames River through the study area will be constructed to determine the water levels and depth of flooding that these flows would create.
The study will address various types of flooding that could occur in the study area. Traditional floodplain mapping will be undertaken for the study area upstream of the diking to Bloomfield Road. A hydraulic assessment will be undertaken to determine the maximum capacity of the diking system to contain high flows. Another analysis will examine what flooding would occur should there be overtopping of the diking system during high flows. Then a complimentary analysis will be conducted examining select locations to determine what would happen should the diking fail due to ice jamming. Work will include analyses that will allow the consideration of alternative planning solutions for areas behind diking systems. Recommendations will be made that will lead to addressing risk management issues and potential for growth adjacent to dikes including spill areas that would result from dike failures.
How to Get Involved
The LTVCA invites anyone interested in the study to attend one of the public information centres where there will be presentations to introduce the study and on the current flood control structures protecting the area. After the presentations there will be time to ask questions to conservation authority and municipal staff.
Date: November 26, 2026 Times: 2:00 p.m.-3:30 p.m. & 6:00 p.m.- 7:30 p.m. Location: Links of Kent Golf Club and Event Centre (20 Indian Creek Rd W, Chatham, ON)
The Study
Lower Thames Valley Conservation Authority is completing a flooding study jointly with the Municipality of Chatham-Kent. This study will examine flooding in the area from the Thames River Outlet at Lake St. Clair upstream to Bloomfield Road at the south-western edge of Chatham. The study will define floodplain areas, which will allow future flood risk analysis and recommendation of actions to reduce potential health and economic loss that could occur during regional flooding.
The Process
The project will undertake floodplain mapping of the main branch of the Thames River from Bloomfield Road downstream to the mouth of the river at Lake St. Clair. The latest technology will be used to create computer models and a high-resolution map of the area that will permit communities to plan with updated floodplain information. The project will analyze historic rainfall and watercourse flow data from around the region and will produce models that will determine the probability of occurrence of flood flows to be used in the floodplain mapping and diking system analysis. A hydraulic model for the Thames River through the study area will be constructed to determine the water levels and depth of flooding that these flows would create.
The study will address various types of flooding that could occur in the study area. Traditional floodplain mapping will be undertaken for the study area upstream of the diking to Bloomfield Road. A hydraulic assessment will be undertaken to determine the maximum capacity of the diking system to contain high flows. Another analysis will examine what flooding would occur should there be overtopping of the diking system during high flows. Then a complimentary analysis will be conducted examining select locations to determine what would happen should the diking fail due to ice jamming. Work will include analyses that will allow the consideration of alternative planning solutions for areas behind diking systems. Recommendations will be made that will lead to addressing risk management issues and potential for growth adjacent to dikes including spill areas that would result from dike failures.
How to Get Involved
The LTVCA invites anyone interested in the study to attend one of the public information centres where there will be presentations to introduce the study and on the current flood control structures protecting the area. After the presentations there will be time to ask questions to conservation authority and municipal staff.
Date: November 26, 2026 Times: 2:00 p.m.-3:30 p.m. & 6:00 p.m.- 7:30 p.m. Location: Links of Kent Golf Club and Event Centre (20 Indian Creek Rd W, Chatham, ON)