McDougall Line Bridge

What is this Study about?

The McDougall Line Bridge over Government Drain No.1 was constructed in 1940 and is located in the community of Tilbury East. In 2019 a structural investigation was completed to assess the current condition of the bridge and concluded the structure was in generally poor condition. The structural investigation identified severe deterioration of concrete on the bridge deck, girders, abutment and piers. As a result of the condition of the bridge the Municipality of Chatham-Kent is undertaking a Municipal Class Environmental Assessment (EA) to evaluate rehabilitation or replacement options for the bridge.

How is this Study being completed?

Given the structures age, repair needs and roadway size limitations, the Study is intended to satisfy Schedule B requirements in accordance with the Municipal Class Environmental Assessment Process, an approved process under the Ontario Environmental Assessment Act. The study will include:

  • Review of background information to confirm the need for the rehabilitation or replacement of the bridge
  • An inventory of the engineering and environmental conditions
  • Development and evaluation of alternative design options to implement the improvements
  • A comparative evaluation of the design options and recommendation of a preferred option
  • Documentation of the process in a Project File made available for a 30-day review period.

How can I participate in this Study?

One digital Public Information Center (PIC) is being planned in 2021 to present the goals and objectives, review the findings and discuss alternative solutions, environmental impacts and mitigation measures. This digital PIC will be posted on the Municipality’s website and a subsequent notice will be distributed highlighting the posting date and time. Information will be collected throughout the study and will be used in accordance with the Municipal Freedom of Information and Protection of Privacy Act. All comments received throughout the study will become part of the public record and included in documentation. For more Information, to provide comments or to be added to the mailing list, please contact Brandon Clark or Jason Cikatricis.

What is this Study about?

The McDougall Line Bridge over Government Drain No.1 was constructed in 1940 and is located in the community of Tilbury East. In 2019 a structural investigation was completed to assess the current condition of the bridge and concluded the structure was in generally poor condition. The structural investigation identified severe deterioration of concrete on the bridge deck, girders, abutment and piers. As a result of the condition of the bridge the Municipality of Chatham-Kent is undertaking a Municipal Class Environmental Assessment (EA) to evaluate rehabilitation or replacement options for the bridge.

How is this Study being completed?

Given the structures age, repair needs and roadway size limitations, the Study is intended to satisfy Schedule B requirements in accordance with the Municipal Class Environmental Assessment Process, an approved process under the Ontario Environmental Assessment Act. The study will include:

  • Review of background information to confirm the need for the rehabilitation or replacement of the bridge
  • An inventory of the engineering and environmental conditions
  • Development and evaluation of alternative design options to implement the improvements
  • A comparative evaluation of the design options and recommendation of a preferred option
  • Documentation of the process in a Project File made available for a 30-day review period.

How can I participate in this Study?

One digital Public Information Center (PIC) is being planned in 2021 to present the goals and objectives, review the findings and discuss alternative solutions, environmental impacts and mitigation measures. This digital PIC will be posted on the Municipality’s website and a subsequent notice will be distributed highlighting the posting date and time. Information will be collected throughout the study and will be used in accordance with the Municipal Freedom of Information and Protection of Privacy Act. All comments received throughout the study will become part of the public record and included in documentation. For more Information, to provide comments or to be added to the mailing list, please contact Brandon Clark or Jason Cikatricis.

  • Please complete this form and return to GM BluePlan Engineering Limited. Please note that this information is being collected in accordance with the Freedom of Information and Protection of Privacy Act. All comments received will form part of the public record and will be incorporated into the final report, excluding personal information.

    Comment Form
Page last updated: 26 Jan 2022, 08:25 AM