Snow Avenue Reconstruction

Scope of the Project

This project consists of the reconstruction of Snow Avenue, from King Street to Chatham Street South, in the community of Blenheim.

Specifically, the project includes:

  • Repair of existing sanitary sewer and the installation of new service connections to the property line;
  • Installing a new storm sewer system and catch basins;
  • Installing new private stormwater drain connections to the property line at each property;
  • Replacing the existing watermain, service connections, and appurtenances;
  • Reconstruction of the existing asphalt road to meet current Chatham-Kent Development Standards;
  • Installing concrete curb and gutter, through Local Improvement;
  • Installing concrete sidewalk;
  • Replacement of driveway approaches within municipal boulevards with concrete to the sidewalk or to match existing where no sidewalk is present; and,
  • Boulevard grading and restoration.

Construction is anticipated to form part of the 2022 construction season.

Online Public Information Centre

The Municipality is holding an online Public Information Centre (PIC) to present the design to the public to provide details of the project and to obtain feedback. The PIC is presented online and in PDF format along with a comment sheet so that you can provide feedback regarding any concerns or other issues associated with the project. Please provide any comments by May 25, 2022, so that your input can inform the next phase of the project.

Scope of the Project

This project consists of the reconstruction of Snow Avenue, from King Street to Chatham Street South, in the community of Blenheim.

Specifically, the project includes:

  • Repair of existing sanitary sewer and the installation of new service connections to the property line;
  • Installing a new storm sewer system and catch basins;
  • Installing new private stormwater drain connections to the property line at each property;
  • Replacing the existing watermain, service connections, and appurtenances;
  • Reconstruction of the existing asphalt road to meet current Chatham-Kent Development Standards;
  • Installing concrete curb and gutter, through Local Improvement;
  • Installing concrete sidewalk;
  • Replacement of driveway approaches within municipal boulevards with concrete to the sidewalk or to match existing where no sidewalk is present; and,
  • Boulevard grading and restoration.

Construction is anticipated to form part of the 2022 construction season.

Online Public Information Centre

The Municipality is holding an online Public Information Centre (PIC) to present the design to the public to provide details of the project and to obtain feedback. The PIC is presented online and in PDF format along with a comment sheet so that you can provide feedback regarding any concerns or other issues associated with the project. Please provide any comments by May 25, 2022, so that your input can inform the next phase of the project.

Page published: 10 May 2022, 09:57 AM